NYC DOT manages over one million traffic signs in New York City. THE EMBARGO INCLUDES BUILDING OPERATIONS. Print his/her name and title and provide a signature. A permit is not required to install, repave, reconstruct or repair any sidewalk where the work involves an area of less than 25 square feet, unless the purpose of the work is to remove a violation. PERMITTEE IS AUTHORIZED TO RESTRICT PARKING IN FRONT OF WRK ZONE & ALONG THE OPPOSITE CURB LN OF WRK ZONE USING NYPD PAPER SIGNS STATING DAY(S) OF WRK. The applicant submits a completed Canopy Authorization Application, which must include the following: Written approval from the owner of the property to which the canopy will be attached. Failure to comply with an order issued by the Commissioner may result in criminal or civil penalties. Chapter 4 describes the processes for executing work in the streets, after permits and approvals are obtained, and the enforcement actions NYC DOT may take to safeguard city streets. NYC DOT project locations, protected streets, and other maps are available online at the Department of Information Technology & Telecommunications (DoITT) NYCityMap website and the DOTMap portal. If the application and its supporting documentation are accepted, the OCMC Project Manager (PM) reviews the application and all associated documents and adds the permit stipulations to the permit application. Get Additional Project Requirement information: Withdrawals of Project Application, Applicant and Contractor, Work Site Safety Requirements for Construction Activity.
Chapter 6 | Zoning Resolution - New York City When the license is issued, the applicant must pay a one-time license fee of $2 per square foot. 8:30 AM to 4:30 PM, Brooklyn Utility companies, developers, contractors, and excavators who undertake any type of construction that will impact the street or occupy it with equipment, structures or other installations must obtain a permit. 75 Park Place, 9th Floor An Occupancy of Sidewalk Permit is required when either more than 3 feet from the property line is obstructed by a fence or a minimum of 5 feet of clear path cannot be maintained for pedestrians, or as otherwise stipulated. Permits are generally tied to scope of work and work type, and are regulated according to the nature of the work, licensing, and registration requirements. THIS STIP IS USED FOR WORK CROSSING THE ROADWAY OR FOR BPP RESTORATIONS THAT FALL OUTSIDE OF THE HALF PLUS FIVE RULE. If work is planned through the HE period, the critical reasons for the work must be included in the Work Description field of the application.
Project Requirements - Registered Design Professional - Curb Cuts This is discussed in greater detail under Section 4.3 Street Restoration Requirements, and in theSections 2-11(e)(15), 2-11(e)(16) and 2-11(f) of the Highway Rules. For failure to comply with the terms or conditions of such permit, the Highway Rules or other applicable law in carrying out the activity for which the permit was issued; Whenever there has been any false statement or any misrepresentation as to a material fact in the application or accompanying papers upon which the issuance of the permit was based; or. NYC DOT may order a vault licensee or the owner of the premises where the vault is located to fill in an abandoned vault. IF LOCATION IS IN SCHOOL ZONE AS SPECIFIED IN SCHOOL STIPULATION, MAY ONLY WORK 9 AM TO 2 PM MON TO FRI WHEN SCHOOL IS IN SESSION (083 STIPULATION). DO NOT PLACE ON MTA/NYCT ANTENNA POLES. NYC DOT's street reconstruction and resurfacing programs include nearly 6,000 miles of city streets. PERMITTEE SHALL NOT MOVE, DAMAGE OR DISRUPT THE BENCH. All active permits in the affected area(s) are suspended during the dates and times of the embargo period and no new permits may be approved, unless a waiver for the work is granted by OCMC. - see. All subway gratings, utility covers and castings situated in the sidewalk area which are not at proper grade or are in a dangerous condition shall be noted in the application; (B)A plan for the restoration of the sidewalk, approved by the Department of Buildings, where the existing sidewalk is the structural roof of a vault or other opening. THIS PERMIT REQUIRED AN ODV PERMIT WHICH MUST BE IN THE VEHICLE FOR INSPECTION BY A POLICE OFFICER AND OR AUTHORIZED GOVERNMENTAL EMPLOYEE UPON REQUEST. THE VMS BOARD MUST STATE THE STREET TO BE CLOSED AND THE DATES AND TIMES OF SUCH CLOSURE. Only a canopy installer or authorized agent that is registered with NYC DOT can apply for a permit to install the canopy. New York, NY 10041 SPECIFICATION. PHONE # 718-422-8700 FAX # 718-422-8710. 10 Richmond Terrace, Room 309 Note: All distances indicate measurements from nearest edge of any object to closest edge of vault. ONE ADDITIONAL LANE ADJACENT TO THE ENCLOSED WORK ZONE MAY OCCUR 12:01 AM - 5 AM NIGHTLY WITH NO NOISE OPERATIONS. Specific requirements for filling in abandoned vaults can be found in Section 2-13(o) of the Highway Rules. NYC DOT has a separate procedure for obtaining permits for emergency street opening/excavation work so that applicants can expeditiously obtain such permits. Homeowners applying for Sidewalk Construction permits who intend to do the work themselves do not need to register. OCCUPY TWO 11 FOOT LANES 12:01 AM TO 5 AM NIGHTLY. The instructions below apply to corporations, partnerships, joint ventures and individuals. For further information regarding fees, the applicant should refer to Section 2-03 of the Highway Rules. WORK ALSO ALLOWED 10 AM TO 6 PM SATURDAY. CONCRETE AND STONE CURB AND GUTTER CURB: EB 21-016: 01/01/22: EB 23-007 : Standard Sheet documents are accessible through the ORIGINAL . Well-maintained curbs facilitate the life of the sidewalk, protect sidewalks from vehicle traffic, channel water properly to catch basins, and prevent erosion and ponding. There must be coordination between the disciplines for the proposed scope of work to ensure Code compliance,* reference AC 28-104.7 and BC 107.2 for information on submittal of and required construction documents.A complete submission of drawings shall include: Construction Documents. THIS PERMIT IS BEING ISSUED WITH THE UNDERSTANDING THAT THE PERMITTEE IS RESPONSIBLE FOR EXTENDED TRENCH MORE THAN REGULAR CUT-BACK AS AGREED TO WITH THE BOROUGH ASHO'S OFFICE. When utility company representatives mark a location, they use colored flags and/or paint to identify the type of underground service: Streets can hide a complex infrastructure of underground utilities.
Chapter 3 | Zoning Resolution - New York City An Occupancy of Roadway Permit is required for closing all or part of one or more lanes of roadway and/or during blasting operations. WORK SATURDAY AND SUNDAY. A one-time Street Opening Permit must also be obtained to install the poles that support the canopy. USE OF METERED, AUTHORIZED PARKING AND NO STANDING ZONES IS PROHIBITED.td>. The best I can come up with is "Every entrance or exit authorized pursuant to applicable law and used by vehicular traffic to or from lands or buildings abutting a roadway." (Bold emphasis by me) The applicant may apply directly for this permit type without being a registered permittee, provided he or she can demonstrate proof of required insurance. To release an FCR hold, the applicant must demonstrate that either he or she has begun the CRIA process or that the CRIA statement is not required. Please visit the Manhattan Office, located at 55 Water Street. Employee Work Areas Office hours: 8:30 AM to 5:00 PM, From 7:00 AM to 3:30 PM, Monday to Friday, call: (212) 839-9660/61/62 THIS APPLIES TO PERMITTEES AND ALL OF THEIR SUBCONTRACTORS. In some cases, approval from the LPC (if the vault is in an historic district) or the Metropolitan Transportation Authority (MTA) (if the vault is near a subway or tunnel entrance) is required. Curb Cut: 3 ft: DOT: Plan Examination Unit: 9: Curb Offset: . Construction documents should represent complete work, including a survey and drawings from multiple disciplines such as architectural and plumbing (if applicable). WORK HOURS 7 AM - 10 PM MON-FRI, AND 10 AM - 7 PM SAT AND SUN. APPLICANT SHALL NOT PLACE CONTAINER IN A WAY THAT CONFLICTS WITH OTHER PERMITTED CONSTRUCTION ACTIVITIES ON THE SAME BLOCK. MUST MAINTAIN SAFE PASSAGE FOR PEDESTRIANS.
Home | Pedestrian Ramp Program WORK MAY OCCUR FOR MSO ONLY FROM 7PM FRIDAY TO 6:00AM MONDAY, 24 HRS A DAY.
NYC homeowners easily get away with illegal curb cuts, says comptroller There are nearly 6,000 miles of streets in New York City. All curb cuts shall comply with the following requirements: The aggregate length of curb cuts shall not exceed 60 percent of any street frontage 100 feet (30 480 mm) or less in length. One tool highlighted in this chapter is DOTMap, a data sharing initiative that allows for better coordination of planned street reconstruction and resurfacing activities with other street excavation work. Permittees are responsible for maintaining the restoration for the duration of the "Guarantee Period" and must retain insurance for this purpose. These forms may also be found inAppendix B, Forms. The requested permit must be appropriate for the type of work that is planned. PERMITTEE MUST EMAIL DEP AT.
Commercial Driveway/Access Permits - New York State Department of A Certificate of Insurance may be provided as proof of insurance coverage only if accompanied by a certification form by the insurance broker or insurance company attesting to the accuracy of the coverage described on the certificate. PERMITTEE SHALL NOT MOVE, DAMAGE OR DISRUPT THE OPERATION OF THE STATION. (iii)The sidewalk shall be constructed of concrete mix as per the Standard Specifications and Standard Detail Drawings, unless otherwise authorized. Office hours: 8:30 AM-4:30 PM, Staten Island Other requirements may apply to the movement of cranes within city limits, such as daily or annual over-dimensional travel permit(s) as issued by NYC DOT. Any definitions found in existing federal, state or city laws, rules and regulations take precedence as the official and legal definitions. 6. 1A. MOVEMENT RESTRICTIONS ALONG EXTERIOR STREET WILL BE IN EFFECT DURING ALL SPECIAL EMBARGOS AFFECTING THE AREA SUCH AS THE POPE VISIT AND ALL STAR GAME. Permittees shall obtain Commercial General Liability (CGL) policies written by companies that may lawfully issue such polices, with an A.M. Best rating of at least A-VII or a Standard & Poor's rating of at least AA. NYCStreets system will automatically block an applicant from submission if insurance is not current. serviceInformation on long-term capital programs from potential street excavators helps NYC DOT to effectively coordinate planned street work. PARKING OF NON COMMERCIAL VEHICLES ON THE ROADWAY, SIDEWALK OR WITHIN THE WORK ZONE IS PROHIBITED. Transportation Systems Commercial Driveway/Access Permits If your commercial property development plans involve new or modified access to a state highway, or involve any change of use or expansion of an existing development on a state highway, you will need a highway work permit from the New York State Department of Transportation (NYSDOT). Clear Width [ 405.5] Ramp runs must have a clear width of 36" minimum (measured between handrails where provided). Include the names of any expediter. Library locations and phone numbers. Brooklyn NYC DOT issues permits for two types of vaults: building vaults and transformer vaults.
Introduction | NYC Street Design Manual Required Documents. (iv)An owner of the abutting property who files an affidavit stating therein that he/she will not employ any person or persons to repair the sidewalk for him/her, shall not be required to submit a commercial general liability insurance policy or workers' compensation insurance. ROADWAY MUST BE RESTORED IN KIND. SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. (1)Roadway pavement shall be 2 inches of asphaltic concrete wearing surface on a 4-inch penetrated broken stone base or a 4-inch compacted plant mixed binder base. Kew Gardens, NY 11415 16 Court Street, 15th floor The concrete base must be restored at the same grade as the existing base; at no time may it be brought up to the asphalt course unless authorized by NYC DOT. WORK 10 AM - 7 PM, MONDAY THROUGH FRIDAY. (iii)Written approval from the Landmarks Preservation Commission or the Art Commission of the City of New York, if applicable (applicant must check to see if the project is in a landmarked area or historic district). Suspension of Application Review NYC DOT may suspend the review of applications for permits pending: Refusal to Issue Permit NYC DOT may refuse to issue a permit to an applicant: Voiding and Reissuing of Permits. ONE 11 FOOT LANE MAY REMAIN CLOSED FOR CONCRETE CURING ONLY FOR MAXIMUM OF48 HOURS. This category of permits applies to authorizations and permits required to place a canopy* over the sidewalk. If there is no hold, the permit is issued to the applicant after appropriate payment is received. If it is determined to be unfeasible, the pending permit will be rejected. NO OCCUPANCY OF ROADWAY OF PERMITTED AFTER WORKING HOURS. Pedestrian RampsWhen a corner is constructed, reconstructed or repaired, pedestrian ramps must be installed in accordance with NYC DOT Standard Highway Specifications found and in accordance with the most recent revision of Drawing H-1011 from the NYC DOT's Standard Details of Construction. WALKWAY IN CLOSED LANE. HIQA Central Office BC 406.7.6 is the only section of the Code that addresses curb cuts. The completed application, affidavit, a stamped self-addressed envelope and a certified check made payable to NYC DOT for the permit fee (currently $70.00 for up to 300 linear feet) must be mailed to: The applicant submits permit application, proof of insurance (originally supplied during the registration process) and supporting documentation for review as to accuracy and completeness. Immediately upon completing the compaction of the backfill of any street opening/excavation, a temporary pavement of an acceptable asphalt paving mixture not less than 4 inches thick after compaction must be installed flush with the adjacent surfaces; or, If plating or decking will be used, the size of the plate or decking must extend a minimum of 12 inches beyond the edge of the, Permanently Restored Opening / Excavation. Listed in the table are the most commonly requested Sidewalk Construction Permit types, which may be used when completing an application. Who has been found liable by a court or in a proceeding before the ECB of a violation of a rule or order of NYC DOT or the terms or conditions of a permit issued by NYC DOT or other applicable law, which violation caused an imminent peril to life or property. The following methods of scoring shall be employed unless otherwise approved by the Commissioner. If it is exactly divisible, all flags shall be 5' wide; if not, the flags shall be plus or minus in an amount which will make them as near to 5' as possible. At the HIQA borough office, applicants will be given a Canopy Authorization Application (. VMS BOARD MUST BE REMOVED UPON COMPLETION OF THE APPROVED CLOSURE. The form must be completed and faxed to NYC DOTs Emergency Authorization Unit (EAU), which will confirm that the applicant's insurance is current and that the location requires an EAN. FOR PROJECT COORDINATION PURPOSES, THE PERMITTEE MUST CONTACT THE RESIDENT ENGINEER FOR THE NYCT SECOND AVENUE SUBWAY PROJECT PRIOR TO COMMENCING WORK. DURING WORKING HOURS SIDEWALK MAY BE CLOSED PROVIDED FLAGGERS ARE AT EACH INTERSECTION AND AT BOTH ENDS OF WORK SITE TO SAFELY CROSS PEDESTRIANS. Chapter 2 describes processes and tools to enhance advance planning and coordination of street work between NYC DOT's own capital resurfacing and reconstruction programs and the street infrastructure work of other stakeholders, especially those that perform a large number of street excavations. If the existing sidewalk is the structural roof of a vault or other opening, a DOB-approved plan for the restoration of the sidewalk, must be submitted as part of the application process. (v)Improper slope, which shall mean (i) a flag that does not drain toward the curb and retains water, (ii) flag(s) that shall be replaced to provide for adequate drainage or (iii) a cross slope exceeding established standards. MAINTAIN ONE 11 FOOT LANE FOR THRU TRAFFIC 9 AM TO 2 PM AND 3:30 PM TO 6 PM MON. Disclaimer: The Codes and other documents that appear on this site may not yet reflect the most current legislation or rules adopted by the City. VARIANCE GRANTED TO WORK DURING THE"HOLIDAY" EMBARGO-NOVEMBER TO JANUARY, AS STIPULATED BY THE OCMC OFFICE. (v)Expansion joints are typically placed at 20' intervals and at the property or lot line. If a permit application includes permit requests to work on embargoed streets within 90 days prior to the start of the HE (November 16th), the permittee will be presented with a warning, during the application process, stating that such permit request(s) will be subject to the upcoming HE. Most vault work also requires plan approval and a permit from DOB. The goal of advance coordination is to reduce the number of excavations in New York City streets. To request release of a CON hold, the applicant must contact the HIQA borough office in the borough in which the proposed work is to be performed to arrange for an inspector to visit the work site prior to the start of the work. Canopies must be well-maintained at all times. If all information is satisfactory, EAU will fax or call the applicant with an EAN, which must be available at the work site and presented to any governmental employee upon request. Tel: (718) 965-7750, Manhattan New York, NY 10023 Long Island City, NY 11101 It also outlines principles for coordinating with NYC DOT when proposing excavation work to help make certain that excavation on streets occurs before or in conjunction with city street work, where practicable. This is part of: 521 CMR. HOWEVER IT MUST BE PRESENTED FOR EXTENSION NO LATER THAN 5 BUS DAYS PRIOR TO EXPIRING. PERMITTEE MAY BE REQUIRED TO REMOVE CONTAINER IMMEDIATELY UPON NOTIFICATION BY NYCDOT OR AUTHORIZED GOVERNMENT EMPLOYEE. Additional information regarding embargo periods is provided in Chapter 3, Section 3.6.2. New York, NY 10007-1216 PERMITTEE MAY OCCUPY CURB LANE 24/7 FROM 10/4 THROUGH OCTOBER 10/15/2010. WORK 9 PM TO 6 AM NIGHTLY. However the permit window remains open until 3:15 PM to pick up permits. HIQA performs inspections during active construction through its completion and up to the end of the Guarantee Period. Applicants have two options to acquire an EAN. Application costs include a $130 filing fee and $3 per lineal foot of curb cut for one-, two- and three-family dwellings, and $6 per lineal foot for multiple dwellings and commercial buildings,. This information should be used to plan work before streets go into protected street status. RESTORE PAVEMENT AFTER SUFFICIENT TIME FOR CURING. See Section 3.5.1 Holds for more information. A curb cut is the area of a sidewalk that has been lowered, or cut down, to facilitate access to the street. By eliminating manual steps, most permit requests now may be approved and issued within 1-2 business days. The Bronx DOT acceptance will be based upon any or all of the following: 1) Visual inspection of field installations. (212) 839-8980 30-30 Thomson Avenue, 4th Floor In such commercial districts, any sidewalk installation or replacement constituting 50 percent or more of the total square footage of sidewalk abutting a property shall be of pigmented concrete in conformance with the Standard Specifications. MAY ALSO CLOSE SIDEWALK ON NORTH SIDE FRONTING DEVELOPMENT. THE TRAFFIC STIPULATIONS ON THIS PERMIT DO NOT GO INTO EFFECT AS LONG AS THE CONTRACTOR CONTINUES TO WORK NON-STOP, AROUND THE CLOCK, TO CORRECT THE EMERGENCY SITUATION. Capital Project In-House (CPI) hold A CPI hold is automatically placed if the proposed permit location involves a street that will be resurfaced by a NYC DOT in-house resurfacing operation in the near future. Bronx, NY 10455 MAINTAIN 5' SIDEWALK AT ALL TIMES. The property owner or designated representative shall contact the Department and submit to the Department for approval: detailed design plans, applicable fee, a duly executed Distinctive Sidewalk Improvement Maintenance Agreement (DSIMA) and material samples of the proposed sidewalk. SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. Transformer vaults are typically installed, owned and maintained by an electric utility company. Fax: (718) 965-7753 The form must be completed and faxed to EAU, which will confirm that the applicant's insurance is current. These include: Certain circumstances are considered to be emergencies, meaning situations that endanger the public safety or cause or are likely to cause the imminent interruption of service. Different from DOB, DOT plans requires 600 PSF live loads on all sidewalk doors, gratings, covers and vault structures. A separate permit is required for each street opening activity. Prior to any permit revocation, NYC DOT will give the permittee an opportunity to be heard with not less than two days' notice. SIGNS MUST BE POSTED AT WORK ZONES AS WELL AS BOTH INTERSECTIONS OF AFFECTED SIDEWALK. Upon satisfactory payment, the hold(s) will be released. RESTORATION OF ROADWAY WHICH HAS GREEN COLORED BIKE LANE MARKING MUST BE RESTORED AS FOLLOWS: FOUR COATS OF GREEN # 105953 RIDE-A-WAY COATING MATER'L MFG'D BY FLINT TRADING INC OR EQUIVALENT. To request release of a CAN hold, the applicant must contact the HIQA borough office in the borough in which the canopy is installed to arrange for a final inspection following canopy installation. The City's parking regulations are part of the Traffic Rules and Regulations. THIS STIP IS USED FOR WORK THAT FALLS BETWEEN LANES AND REQUIRES THE CONTRACTOR TO RESTORE THE ROADWAY FROM 1' PAST THEIR RESTORATION TO THE NEAREST CURB FOR THE LENGTH OF THEIR WORK. Permits that have expired may be reissued only within30 daysof expiration.
NYC DOT - Parking Regulations SECTION 24-224 ADMINISTRATIVE CODE VARIANCE GRANTED FOR HOURS AND DAYS STIPULATED HEREIN. New York, NY 10013 Questions regarding permit registration or application processes can be directed to any Permit Office.
Zoning Resolution Coordination with capital projects all city, state and federal agencies and public authorities. (viii)Non-compliance with Department specifications for sidewalk construction. With advance notice of proposed excavation work, NYC DOT can sequence the timing of the large number of roadway and utility works being undertaken across the city. MOBILAZATION OF PROJECT INCLUDING RE-STRIPPING OF ROADWAY AND INSTALLATION OF BARRIERS WORK ONLY 10PM TO 6AM MON TO FRI AND 10PM TO 8AM SAT AND SUNDAY. The permittee must attach a copy of the original permit to the application when requesting a re-issuance and all applicable reviews and fees will apply. Common examples include approval from the New York City Department of Parks and Recreation (Parks) if any street trees or tree pits will be affected by the proposed work; a permit from the New York City Department of Environmental Protection (DEP) if any water or sewer line will be affected; and a Certificate of Appropriateness from the New York City Landmarks Preservation Commission (LPC) if the proposed work is within an Historic District. (212) 839-2399 SECTION 7: AUTHORIZED REPRESENTATIVES TO OBTAIN PERMITS. Queens.Forestry@parks.nyc.gov
Curb Cuts - Buildings - NYC.gov (B)The soil level in the completed tree pits, including any paved surface, shall be flush with the sidewalk area and the maximum dimensions of the tree pit shall be 5' 5'. THIS PERMIT BECOMES VOID WHEN THE BUILDING STRUCTURE FIRST FLOOR LEVEL IS COVERED BY A ROOF, SECOND FLOOR OR A SECOND FLOOR SLAB. (vii)A defect involving structural integrity, which shall mean a flag that has a common joint, which is not an expansion joint, with a defective flag and has a crack that meets the common joint and one other joint. The details can be used for preparing permit applications, or for . Although registration is a one-time process, registered applicants must keep all insurance and general information up to date, which must be done in person at the central Permit Office. Loading Zones
All applications for construction or repair of a transformer vault must be accompanied by an electric utility company layout, and must comply with the minimum clearance requirements for transformer vaults unless an approval or waiver is obtained from the appropriate agency or utility (more information is available inAppendix B, Forms). THIS STIP VOIDS ANY/ALL OTHER CONFLICTING STIPS ON THIS PERMIT UNLESS ACCOMPANIED WITH VARIANCE STIP VAR001. If the applicant intends to do work associated with a Franchise, Concession or Revocable Consent Agreement, the applicant must have a copy of the Agreement prior to applying for a permit. CONTRACTOR MUST NOTIFY THE ALLIANCE FOR DOWNTOWN NEW YORK 120 BROADWAY SUITE 3340 NEW YORK, NEW YORK 10271 212-566-6700, AT LEAST 3 BUSINESS DAYS PRIOR TO STARTING WORK. PEU also accepts applications to abandon existing vaults that are no longer in use. A minimum of 2 cores is required. Street Opening Permits are designated as the "01" permit series, meaning all permits in this category begin with "01."
2-09 Sidewalk, Curb and Roadway Work. - American Legal Publishing 26-23 Requirements for Planting Strips and Trees The alternate side parking calendar lists the legal and religious holidays with scheduled alternate side parking suspensions. All addresses must be the same on all above referenced documents. RED LIGHT CAMERA CONDUIT IS LOCATED IN YOUR PROPOSED WORK AREA. New York, NY 10007 (2)If a submittal is not professionally self-certified, full Department review and approval must be obtained before work can begin. New York, NY 10007 If the applicant does not agree with the PM, he or she is informed of the appeals process. Fax: (718) 815-8391. The central Permit Office accepts money orders, company checks, certified checks and most major credit cards as payment for permit fees. Substantive changes that meet the following criteria should be submitted for review as a PAA to amend the approved plans: 4. Curb Cuts. Original insurance certificates for Commercial General Liability (CGL) insurance and Worker's Compensation insurance. CONTRACTORS SHALL NOTIFY IN WRITING BY LETTER POLICE, FIRE, EMS, COMMUNITY BOARDS, AND ALL PROPERTY OWNERS ON THE AFFECTED STREET SEGMENT A MINIMUM OF 7 CALENDAR DAYS PRIOR TO CLOSURE. Joints shall not be sealed during freezing temperatures. (ii)The foundation material shall consist of clean 3/4 in. If schools have summer sessions or are open for teacher meetings or similar activities, even if students are not attending, the parking regulations apply on such days. PLEASE CONTACT THE NYC DEPARTMENT OF ENVIRONMENTAL PROTECTION (. THE SITE OF YOUR PROPOSED WORK MAY BE WITHIN 100FT OF A BRIDGE STRUCTURE. New York City Department of Transportation Any corrective action required by the CAR must be performed within 30 daysof the issuance of the CAR. 16 Court Street, 7th Fl. Applicants must first submit an Emergency Authorization Number Form. The full list of rules and regulations is contained in the Highway Rules, Sections 2-02 and 2-04, and should be consulted before any work is performed on the street. MAY WORK 24/7, OCCUPY CURB LANE, ALL EQUIPMENT, STORAGE OF MATERIAL ALLOWED. If there is a hold during the processing of the permit, the applicant is notified of the type of hold and the steps to take to release the hold. Post Approval Amendments. Some of the activities covered include placement of materials, equipment and temporary structures on the street or movement of construction equipment across roadways and sidewalks. Some permit types can also be processed at the relevant borough office. WORK ALLOWED 8 AM TO 4 PM SATURDAY. AND NYCTA. Tel: (718) 390-2080, The Bronx Learn how to retrieve a towed vehicle from the Police Department. Permit applications for the following work shall be reviewed by DOT's Office of Construction Mitigation and Coordination (OCMC) prior to issuance: Unless otherwise authorized, permits shall be kept at the work site or designated field headquarters at all times and shall be made available for inspection upon request of any police officer or any authorized employee of the Departments of Environmental Protection, Buildings, Police and Transportation or any other City employees specifically authorized by the Commissioner to enforce these rules.
Northern Mariana Islands Type Of Government,
Articles N